Headsail change

 

Home Forums Sailing Technical Headsail change

This topic contains 2 replies, has 2 voices, and was last updated by  Jean Andre 8 years, 6 months ago.

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #4248

    Jean Andre
    Participant

    How do you guys do your Sheets when going from #1 to #2 to Jib?

    Do you use the same one or do you leave sheets attached to the sail and thread them through the blocks as you need?

    Cheers

    J

    #4249

    Ray
    Participant

    Same configuration, but move the genoa cars forward until the sheeting angle looks about right and telltales break evenly. I have a simple forestay (no Tuffluff), so to minimize the amount of time I have no headsail, I’d run new sheets (I have two pair) then swap out as fast as possible.

    • This reply was modified 8 years, 6 months ago by  Ray.
    #4255

    Jean Andre
    Participant

    Thanks Ray,
    I too use hanks on my foresails, and I was thinking about that either. You can hank the new sail on the bottom, them run new sheets, then drop one and hoist the other. Does this sound right to you?

    Cheers

Viewing 3 posts - 1 through 3 (of 3 total)

You must be logged in to reply to this topic.